
How
to
Set
Up
and
Run
the
FG5
3
3.3.4.DROPPING CHAMBER
7. Press RESET on dropper controller.
8. Disconnect the shaft encoder, motor power, and cart control cables from
the dropping chamber.
9. Engage the dropping chamber travel lock.
3.3.5.POWER
10. Turn off the UTIC and any other devices that are still on.
11. Turn off the AC and DC power (rear of electronics rack).
3.4. Disassembling and Packing
the
FG5
NOTE:
Please follow these instructions carefully. Care in packing the
components properly will result in easier and faster set-up in the field, and
will help protect the instrument from damage.
3.4.1.ELECTRONICS:
Unplug cables from the electronics rack and components.
1. APD power cable
2. TTL fringe BNC cable
3. Laser signal cable
4. Laser HV BNC cable
5. Temperature monitor BNC cable
6. AC Mains power cord
7. AC computer power cord
3-23
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...