Checklists and Logs
Appendix D
Push bearings out of yoke.
Make sure new bearings are cleaned and lubricated with Krytox
LVP low vacuum grease.
Reassemble in reverse order (make sure bowed snap ring is
oriented correctly and fully seated in groove).
Table 9-11 Shaft Bearings- Drive Pulley
9.4.9.Replacing Shaft Bearings (Top
Pulley)
Replacing Shaft Bearings (Top Pulley)
Remove dropping chamber cover.
Remove drive belt.
Remove snap rings on upper bump stop and slide down shaft.
Remove retaining rings on top of upper pulley yoke.
Remove pulley (slide down).
Remove bowed retaining ring from short end of pulley shaft (note
orientation).
9-19
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...