MONGOOSE PRO Shale Shaker
20
Field Installation and Operation Manual 9092F02001AENG (D)
20
3.
Using a 30mm socket wrench, loosen the bolt on the feed end shipping brackets (Refer to Figure 19)
4.
Store brackets on the unit, using integrated bolt holes on the skid to hold the brackets in place
(Refer to Figure 18 & Figure 19).
Figure 18. Discharge End Shipping Bracket Engaged (Left) and Stored (Right)
Figure 19. Feed End Shipping Bracket Engaged (Left) and Stored (Right)
11.
PREPARING UNIT FOR OPERATIONS
11.1
Confirming Motor Weight Rotation
WARNING
PERFORM A LOCKOUT / TAG OUT PROCEDURE TO ISOLATE THE UNIT FROM THE
RIG POWER SUPPLY.
KEEP ALL GUARDS IN PLACE AT ALL TIMES TO AVOID EXPOSURE TO PARTS
ROTATING AT HIGH SPEEDS.
WHEN POWER IS ON, SEVERE INJURY CAN OCCUR IF HANDS OR FEET REACH
INSIDE THE EQUIPMENT.
1.
Remove vibrator covers.
2.
Confirm counter-weights match the specified operating frequency (Refer to Figure 20 & Figure 21). Note the
recessed face on the 50Hz Swing Weight Motor.