M
‑
I SWACO
MONGOOSE PRO Shale Shaker
16
Field Installation and Operation Manual 9092F02001AENG (D)
16
TIP
ALTERNATE INLETS ARE LOCATED ON THE BOTTOM OF THE CONTROL BOX.
THESE INLETS ARE EASIER TO USE WITH CERTAIN CONFIGURATIONS.
2.
Remove inlet port plug on control panel box (item b, Figure 15)
3.
Insert cable gland and wires through connection port.
NOTE
THE GREEN WIRE IS THE GROUNDING LEAD. THE BROWN, WHITE/GREY, AND
BLACK WIRES ARE ALL LIVE POWER LEADS.
4.
Attach (crimp) a terminal ring connector to the wire ends of the grounding cable.
5.
Loosen wire clamp screws on power distribution box (item a, Figure 15).
6.
Insert bare wire endings of the power leads into power distribution box.
7.
Retighten screws on power distribution box once wires are in place.
8.
Inspect o-ring seal on door surface. Replace if damaged.
9.
Install ALL exterior door bolts to completely close and seal the enclosure.
Figure 13. UL Motor Control Panel
Green START
Button
Red STOP
Button
Normal/ Capacity
Selector Switch