M
‑
I SWACO
MONGOOSE PRO Shale Shaker
32
Field Installation and Operation Manual 9092F02001AENG (D)
32
Figure 26. Use Extra Wedges with a Mallet to Loosen Screen Wedges
Figure 27. MONGOOSE PRO Cable Tower with Wedge Holders
15.3.2
Replacing Screens
TIP
ALWAYS WASH DOWN SCREEN BED AND SCREEN GASKETS PRIOR TO
INSTALLING NEW SCREENS.
NOTE
DO NOT HAMMER WEDGES TOO TIGHTLY OR THEY WILL BE EXTREMELY
DIFFICULT TO REMOVE.
TIP
BOTH WEDGES MUST BE IN POSITION PRIOR TO SECURING THEM. FAILURE TO
DO SO COULD PREVENT OPERATORS FROM SEC
URING THE SCREEN’S OTHER
WEDGE.