M
‑
I SWACO
MONGOOSE PRO Shale Shaker
37
Field Installation and Operation Manual 9092F02001AENG (D)
37
3.
Connect motor leads to the correct terminals.
4.
Place the thick isolator on top of motor leads (Refer to Figure 31).
5.
Replace cover.
6.
Replace cover bolts, tightening them to secure the motor.
Figure 31. Thin Lower Isolator; Leads Showing (Left) and Thick Top Isolator; Leads Not Showing (Right)
15.5
Maintaining Isolation Springs
Isolation springs isolate the skid and immediate surroundings from the vibratory motion of the motors and shaker
basket. Their condition is vital to the performance of the Shale Shaker.
Figure 32. Spring Enclosed in Nitrile Boot
15.5.1
Inspecting Springs
Examine each spring for signs of fatigue or fracture every 3 months. Perform additional examinations if the
shaker basket is tilting side-to-side or cuttings are running to one side of the basket.
TIP
SPRINGS ARE COVERED WITH A PROTECTIVE BLACK NITRILE BOOT THAT
PROVIDES A SAFETY PRECAUTION AGAINST BARE SPRINGS, WHICH ARE A
POTENTIAL PINCH POINT (REFER TO FIGURE 32).
•
Check for spring fatigue by leveling the basket and measuring the height of each spring.