M
‑
I SWACO
MONGOOSE PRO Shale Shaker
33
Field Installation and Operation Manual 9092F02001AENG (D)
33
NOTE
WEDGES FOR THE SECOND SCREEN FROM THE FEED END ARE REVERSED FOR
EASIER INSTALLATION.
1.
Lay new screen into shaker deck.
2.
Position one screen wedge between the screen edge and the support bar on the shaker basket interior sidewall
(Refer to Figure 28).
3.
Position another wedge on the other side of the screen in the same manner.
4.
Hammer each wedge securely into position.
5.
Condition the screen mesh by wetting down new screen mesh with a compatible base fluid PRIOR to
operations.
Figure 28. Screen Wedge Secured to Unit