5.2.2 Installation on surface installation frames
The optional installation frame is to be installed according to the installation drawing. If
the floor is not even, it might be necessary to straighten the installation frame to a position
nearer to the horizontal by putting some stainless steel spacers between the frame and the
floor, so that the adjustment range of the pillar is sufficient.
The junction between the installation frame and the floor is sealed with silicone or similar.
1.
Surface frame
2.
Concrete casting
3.
Fixing bolt for surface frame
4.
Finished floor surface
5.
Silicone mastic
6.
Acrylic filler
Fixing bolts of the surface in stallation must be chosen acco rding to the floor material.
Recommended type is a UKA 12x200 chemical bolt, which is suitable for different floor
materials. Alternatively expansion-shell bolts or equivalent can be used.
Place the kettle on the surface installation frame and adjust to a horizontal position with
4 adjusting bolts which are in the corners of the pillars. When the kettle is in a horizontal
position it will be fixed by screwing the nuts on the two fixing bolts of the surface instal-
lation frame. Tighten the fixing nuts careful ly. Do not seal the space between the kettle
pillars and surface installation frames, as there must be enough change of air.
5.3 Electrical and water connections
The electrical and water connections for each kettle (single or group) are made through
the floor to the right-hand kettle pillar according to the installation drawing. The water
pipes must not rise more than 100 mm from the floor surface.
1
5
4
6
3
2
Summary of Contents for Culino Combi 40S
Page 2: ......
Page 4: ...15 6 2012 Rev 1 7...
Page 50: ...15 6 2012 Rev 1 7 Troubleshooting 44...
Page 52: ...Installation drawing L00133 C3...
Page 53: ...Installation dimensions K02450 A3...
Page 54: ...Text L00134 B4...
Page 55: ...Steam supply recommendations 000030 A4...
Page 58: ......