Cylinder head bolts
(17, 18, 19) . . . . . . . . . . . . .
unbolt in opposite order of torquing diagram,
check length of cylinder head bolts and replace
if necessary. Bolt on according to torquing
diagram, socket 601 589 00 10 00
(items 17, 20, 23 28).
Note
Observe different lengths of bolts and tightening
specifications.
Cylinder head (20)
remove together with cylinder head gasket
install (items 18, 19, 21, 22).
Note
Clean parting surfaces on cylinder head and
check for cracks. Install cylinder head with new
gasket.
After assembling engine
check cooling and engine oil systems for
leakage (item 38).
Tightening torques and rotation angles
(tightening in stages)
Nm
Cylinder head bolts with
Initial tightening torque
Stage 1
15
Allen head (engine cold)
Stage 2 35
Rotation angle
Stage 3
Interval for setting
10 min
Rotation angle
Stage 4
M 8 Allen bolts in area of timing chain case (reference value)
25
Exhaust pipe on exhaust manifold
25
Side exhaust support
25
01.10
Summary of Contents for 602
Page 1: ...Mercedes Benz Mercedes Benz of North America Inc Montvale NJ 07645 ...
Page 5: ...General technical data 00 ...
Page 15: ...Crankcase and Cylinder Head 01 ...
Page 22: ......
Page 33: ......
Page 89: ......
Page 140: ......
Page 191: ...This page int ntiowally left blank 03 10 32113 ...
Page 227: ...ine Timing Valvstr ...
Page 282: ...Special tool f 05 10 310 5 ...
Page 301: ...ystern Air r Turbocharger 09 ...