70
1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
STEP 13 - OPTIMIZE HYDRAULIC FLUID LEVEL -
Continued
6.
Close
(FOLD)
the platform by setting
toggle switches as shown in
FIG.
70-1
.
7.
Raise
(UP)
the runners to stow
platform by setting toggle switches
as shown in
FIG. 70-2
.
FOLDING PLATFORM
FIG. 70-1
RAISING PLATFORM
FIG. 70-2
UP
FOLD
Summary of Contents for BMR-CS
Page 103: ......