61
1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
150 AMP
CIRCUIT
BREAKER
MASTER
DISCONNECT
SWITCH
FIG. 61-2
FIG. 61-3
3.
If Liftgate comes with:
• Single Pole Tractor Charge Line Kit
• Single Pole Trailer Charge Line Kit
• Dual Pole Tractor Charge Line Kit
• Dual Pole Trailer Charge Line Kit
Install charge line according to
Instruction Sheet
contained in
each kit.
1.
Install charge line by running the
line along vehicle frame
as
follows.
• Inside of truck frame
(FIG. 61-1)
• Bottom of trailer frame
2.
Run the charge line from truck bat-
tery or nose of trailer to one of the
following devices.
• Master disconnect switch on
pump box
(FIG. 61-2)
• The 150 amp circuit breaker in
optional battery box
(FIG. 61-3)
Use frame clips (Parts Box item)
(FIG. 61-1)
and plastic ties, as
required from charge line kit, to
secure cable to vehicle.
NOTE:
Make sure cable is long enough to reach master disconnect switch on Lift-
gate pump box, or circuit breaker in optional battery box (if equipped), without
putting strain on the cable. If equipped with fused cable, ensure the
fuse
end
is by the vehicle battery.
STEP 10 - RUN CHARGE LINES - Continued
RUNNING CABLE FROM VEHICLE BATTERY
FIG. 61-1
VEHICLE
FRAME
18” - 24”
SPACING
CHARGE LINE TO
PUMP BOX OR
BATTERY BOX
FRONT OF VEHICLE
REAR OF VEHICLE
CHARGE LINE
TO VEHICLE
BATTERY
FRAME
CLIPS
Summary of Contents for BMR-CS
Page 103: ......