52
1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
RUN HYDRAULIC LINES
STEP 8 - RUN HYDRAULIC LINES & ELECTRIC CABLES
- Continued
POWER DOWN PUMP BOX INSTALLATION: REQUIRED HOSES
3 FT.
10 FT.
15 FT.
1
HP 1/4” X 34” LG.
HP 1/4” X 166” LG.
HP 1/4” X 226” LG.
2
HP 1/4” X 64” LG.
HP 1/4” X 188” LG.
HP 1/4” X 248” LG.
3
HP 3/8” X 72” LG.
HP 3/8” X 196” LG.
HP 3/8” X 256” LG.
4
HP 3/8” X 150” LG.
HP 3/8” X 274” LG.
HP 3/8” X 334” LG.
TABLE 52-1
POWER DOWN PUMP BOX INSTALLATION: REQUIRED HOSES
20 FT.
28 FT.
1
HP 1/4” X 286” LG.
HP 1/4” X 382” LG.
2
HP 1/4” X 308” LG.
HP 1/4” X 404” LG.
3
HP 3/8” X 316” LG.
HP 3/8” X 412” LG.
4
HP 3/8” X 394” LG.
HP 3/8” X 490” LG.
TABLE 52-2
NOTE:
Each pump extension kit contains 2 hoses of the same length
(item 1)
.
One hose is for the
Platform Fold Line
and the second hose is for the
Platform Unfold Line
. One hose has a yellow band on each connector
to help connect the 2 hoses to the correct
fi
ttings. For example, connect
hose with yellow bands to the
Fold Line
on the RH column and the
Fold
Line
on the back of the pump box.
NOTE:
See
TABLES 50-1, 50-2 & 50-3
for hydraulic
fi
ttings torque values.