Entrée Bath Gen III-
MODEL MB-68 AV-XL
10-20-19
Page 4 of 51
450 E 32
nd
Ave – Fremont, NE 68025
800-798-5867 FAX: 402-721-3023
www.mastercarebath.com
Switches:
Membrane and Pneumatic.
Thermometer:
Digital temperature measurements.
Door/Entry:
Door full length of tub with swivel seat rotating out for easy transfer.
Tub Fill/Shower:
Built-in thermostatic mixing valve certified to ASSE 1016-2005, ASME A112.18.1-2005,
CSA B125 and UPC listed.
Tub Fill / Shower shut off:
Valves certified ASSE and UPC listed with ceramic disc controls.
Tub Shell:
Sanitary gel-coated FRP (Fiberglass Reinforced Polymer).
Tub Water Use:
65 gallons minimum with normal displacement 4 inches below overflow escutcheon.
Waste
:
2" PVC schedule 40 pipe. DO NOT Hard-Plumb for ease of accessibility for servicing.
Water Connection:
¾” SS braided flex hose with female pipe thread connections.
Water Supply:
¾” hot and cold with shut-offs. Hot and cold water pressure 45-90 psi. Hot water
temperature to be 120º F and cold water 59º F.
Shipping Weight:
Approximately 1,000 lbs.
Fill Rate:
In excess of 17 GPM provided that the water lines are ¾”, water pressure is at least 60
psi and the hot water is 120º F. Facility and/or other environmental factors may affect
the fill rate.
Establishment Registration 3003336913
1)
Risk of electrical shock: Disconnect electric power source before installation and
subsequent servicing.
2)
An equipment-grounding terminal is provided in the field wiring compartment. To reduce the
risk of electrical shock, this terminal must be connected to the grounding means provided in
the electric supply panel with a conductor equivalent in size to the circuit conductors
supplying this equipment.
3)
Install this unit in accordance with the U.S. National Electrical Code in the U.S.A. and the
Canadian Electrical Code, Part I in Canada. Electrical service receptacle must be grounded
for product with a 3-prong cord. In addition, the equipment ground bond wire must be
attached per wiring diagram.
High Quality and wood stud floor or concrete required.
IMPORTANT: This tub should be installed against a finished wall or alcove. DO NOT BUILD THE TUB IN so it can be
moved for serviceability if necessary.