KJM MANDÍK
–
Detailed operating instructions
M&C KJMPNO 07/2022
MANDÍK, a.s.,
6
2
Related documents
The following documents are included with every M&R supplied with the AC unit and should be
placed near the AC unit:
Warranty certificate Certificate of the switchboard test per ČSN EN 61439-1-ED2
M&C drawings
3
Safety
When using the M&C, the instructions in this regulation must be observed.
The applicable standards, safety regulations, and generally accepted technical rules
must be observed when installing, wiring, commissioning, repairing, and maintaining
the units.
Only individuals or legal entities with valid authorisation are permitted to conduct
assembly of the unit, including electrical wiring, commissioning, repairs,
maintenance, and operation.