
44
SP2000, SP2300, SP2400 | 1.00.03
www.mc-techgroup.com
Draw the heating cartridge through the cable gland
C
(figure 21) out of the connection box.
Draw out the thermostat sensor through the cable gland in the opposite direction.
Mount the new thermostat and lead the thermostat sensor from inside through the cable gland.
Feed the new heating cartridge from outside through the cable gland.
Connect the electrical cables according to the connection plan (figure 9).
Mount the complete unit to the probe again.
The thermostat is equipped with a mechanical stop that limits the maximum temperature adjustable via the turning
knob.
When mounting the thermostat pay attention that the mechanical stop is mounted so that the arrow on the me-
tallic ring shows to the desired maximum temperature. (Standard adjustment 190 °C [374 °F]).
Figure 23
Adjustment of the mechanical stop at the thermostat controller
If you use gas sample probes with temperature sensor (PT100 or thermoelement) instead of the thermostat, lead
the sensor connecting cable with the heating cartridge through the cable gland. In order to do this, put the con-
necting cable into the corrugation of the sealing rings and the two metal rings.
18
SWITCHING OFF
Caution
Before switching off, i.e. switching off the heating, the gas flow via probe has to be stopped and the
probe has to be flushed with inert gas or air in order to avoid condensation of aggressive compo-
nents from the process gas.
19
PROPER DISPOSAL OF THE DEVICE
At the end of the service life of our products, it is important to take care of the appropriate disposal of obsolete
electrical and non-electrical devices. To help protect our environment, follow the rules and regulations of your
country regarding recycling and waste management.
Adjusting knob
Mechanical stop
Locking screws
D
Fixing screws
E
Summary of Contents for SP Series
Page 48: ...48 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 24 SP2000 H basic version ...
Page 49: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 49 Figure 25 SP2000 H with options ...
Page 50: ...50 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 26 SP2300 H ...
Page 51: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 51 Figure 27 SP2300 H filter elements ...
Page 53: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 53 Figure 29 Heated sample tubes SP30 H ...
Page 54: ...54 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com ...
Page 56: ...56 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 31 SP2000 H 3VA MS NC B ...
Page 57: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 57 Figure 32 SP2000 H 3VA MS NC C ...
Page 58: ...58 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 33 SP2000 H 3VA MS NO B ...
Page 59: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 59 Figure 34 SP2000 H 3VA MS NO C ...