
28
SP2000, SP2300, SP2400 | 1.00.03
www.mc-techgroup.com
Caution
If not all cable glands are used for the electrical connection of the temperature regulator,
the remaining ones must be shut in order to guarantee the tightness of the housing.
Figure 11
Electrical connection electronic controller 70304G
16
STARTING
Before starting up check whether the mains power supply voltage corresponds with the information stated on
the probe's nameplate.
If there is a built-in ball valve you should also check, if it is closed. In case of hand-operated ball valves, the control
grip must be located at the right-hand stop.
Switch on mains power supply.
Check the rated value setting on the built-in thermostat or on the external controller.
The total heating-up time is approximately 2 hours. After about 1 hour the probe is already sufficiently heated
for the temperature to have exceeded the temperature failure alarm value (30 °C below rated value), but it still
takes about another hour until operating temperature is reached.
Summary of Contents for SP Series
Page 48: ...48 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 24 SP2000 H basic version ...
Page 49: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 49 Figure 25 SP2000 H with options ...
Page 50: ...50 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 26 SP2300 H ...
Page 51: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 51 Figure 27 SP2300 H filter elements ...
Page 53: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 53 Figure 29 Heated sample tubes SP30 H ...
Page 54: ...54 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com ...
Page 56: ...56 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 31 SP2000 H 3VA MS NC B ...
Page 57: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 57 Figure 32 SP2000 H 3VA MS NC C ...
Page 58: ...58 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 33 SP2000 H 3VA MS NO B ...
Page 59: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 59 Figure 34 SP2000 H 3VA MS NO C ...