Lower the
Vacuum Tank Assembly (Section B)
onto
the Retention Hopper Assembly. Align the enclosed
side of each section (as shown in image at right). Align
the bolt holes of each section.
Remove the rear panels of Retention Hopper Assembly
(A) and Vacuum Tank Assembly (B) to gain access to
the connections that need to be made within the
enclosure. Install the 10 1/2-13 grade 8 bolts and
tighten.
Install the Heating Hopper
Raise the Heating Hopper on top of section B of
the ULTRA dryer.
Position the Hopper so that the front hatch faces
the same side of the dryer as the ULTRA
’s
control panel.
Install the 10 1/2-13 grade 8 bolts and tighten.
Connect RTD Sensors and Air Lines
After installing the Heating Hopper,
located the upper sheet metal panel
with the slotted holes. Remove the
button head screws and bring the three
air lines and 3 sensor cables through
the slotted holes. Each sensor cable is
labeled for the specific slots. Air lines
are labeled yellow, white and blue.
Also bring the rubber grommets
through the sheet metal and install the
grommets in the slot to protect the
wires and air lines. Connect the air
lines, Connect the sensor cables and
reinstall the sheet metal panel.