214323
484
Revision B
1001245
A
B
Figure 6.276: Bushing
23. Install bushing clamp (A) onto the tine tube adjacent to the
flangeless end of bushing (B).
24. Position clamp (A) on bushing (B) so the edges of the clamp
and bushing are flush when the clamp is fit into the groove
on the bushing and the lock tabs are engaged.
1009869
A
B
Figure 6.277: Clamp on Bushing
25. Tighten clamp (A) using modified channel lock pliers (B)
until finger pressure will
NOT
move the clamp.
IMPORTANT:
Overtightening the clamp might break the clamp.
1009847
A
C
D
E
B
Figure 6.278: Tine Tube Support
26. Reattach channels (C) to support (A) with screws (B) and
nuts. Torque the screws to 43 Nm (32 lbf
∙
ft).
27. Reinstall any fingers (D) that were previously removed
using screws (E). For instructions, refer to
Summary of Contents for FD75
Page 8: ......
Page 43: ...214323 25 Revision B Figure 2 1 Header Width 1018123 A B PRODUCT OVERVIEW ...
Page 71: ...214323 53 Revision B For more information refer to Table 3 4 page 51 OPERATION ...
Page 306: ......
Page 360: ......
Page 524: ......
Page 538: ......