Troubleshooting a Leased Line Connection
19-8
PortMaster Configuration Guide
Troubleshooting a Leased Line Connection
Use the information in this section to debug your configuration.
If you have trouble with a leased line connection, verify the following:
•
Enter the following commands to view the PPP negotiation on port S1, if this is the
port you are using:
Command>
set
console
s1
Command>
set
debug
0x51
Command>
reset
s1
For information about the interpreting the results of the debug command, refer to
the
PortMaster Troubleshooting Guide
.
After you verify that the PPP negotiation is correct, enter the following commands
to turn off the debug utility:
Command>
set
debug
off
Command>
reset
console
•
The error counters should be 0 (zero) except for abort errors. If your counters are
nonzero, the problem is external to the PortMaster.
Note –
CRC errors will occur if the cable is ever unplugged from the PortMaster.
•
Verify that you are using the correct cable and that it is attached securely to the
correct port. Not all WAN ports are capable of the same speeds.
•
Verify that the DIP switch next to the synchronous port is set to V.35 for Lucent
cables and that you are plugged into the correct V.35 interface on your CSU/DSU.
•
Verify that the CSU/DSU is providing the clock to the PortMaster. The CSU/DSU can
generate the clock or receive it from the carrier.
•
Verify that the CSU/DSU is configured properly.
•
If you have a Cisco router on the other end of your connection, make sure that it is
running Cisco’s software release 9.14(5) or later and is using PPP encapsulation, not
High-Level Data Link Control (HDLC).
•
If the framing errors are greater than 0, verify that the router on the other end of
the connection is running the PPP protocol.
✍
Summary of Contents for PortMaster
Page 16: ...Contents xvi Configuration Guide for PortMaster Products...
Page 26: ...Subscribing to PortMaster Mailing Lists xxvi PortMaster Configuration Guide...
Page 32: ...Basic Configuration Steps 1 6 PortMaster Configuration Guide...
Page 114: ...Configuring WAN Port Settings 6 12 PortMaster Configuration Guide...
Page 128: ...Configuring Login Users 7 14 PortMaster Configuration Guide...
Page 158: ...Restricting User Access 9 16 PortMaster Configuration Guide...
Page 168: ...Configuring Ports for Modem Use 10 10 PortMaster Configuration Guide...
Page 222: ...Frame Relay Subinterfaces 13 16 PortMaster Configuration Guide...
Page 236: ...Troubleshooting a Synchronous V 25bis Connection 14 14 PortMaster Configuration Guide...
Page 252: ...Using ISDN for On Demand Connections 15 16 PortMaster Configuration Guide...
Page 264: ...Using ISDN for Internet Connections 16 12 PortMaster Configuration Guide...
Page 276: ...Configuration Steps for Dial In Access 17 12 PortMaster Configuration Guide...
Page 286: ...Configuration Steps for Shared Device Access 18 10 PortMaster Configuration Guide...
Page 296: ...Troubleshooting a Leased Line Connection 19 10 PortMaster Configuration Guide...
Page 310: ...B 4 PortMaster Configuration Guide...
Page 352: ...Command Index Command Index 6 PortMaster Configuration Guide...