...........................................................................................................................................................................................................................................................
Installation Checklist
Overview
E - 6
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
Part III Metropolis® DMXtend Access Multiplexer Ring Setup and Testing
Chapter 6, Ring Setup and
Testing: Integration
Procedures
Yes
OC-3 Optical Transmission Test (page 6-9)
OC-12 Optical Transmission Test (page 6-10)
Automatic Protection Switching Test (page
6-11)
Yes
Manual Switching Tests (page 6-13)
Yes
Yes
Notes:
1. Only required if equipped.
Table E-1
Installation Acceptance Checklist (Continued)
Section and Chapter
Procedure
Required
Completed
Yes
No