![Lucent Technologies Metropolis DMXtend Installation Manual Download Page 195](http://html.mh-extra.com/html/lucent-technologies/metropolis-dmxtend/metropolis-dmxtend_installation-manual_1946309195.webp)
Installation Tests
Local Equipment and Cross-connect Tests
...........................................................................................................................................................................................................................................................
4 - 2 1
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
............................................................................................................................................................................
Step 7
Verify that the port you are connected to matches the one listed in the
aid of the FE-LAN LOS alarm output.
............................................................................................................................................................................
Step 8
Click on the
upd-sys
command.
............................................................................................................................................................................
Step 9
Click
Send
to issue the command.
............................................................................................................................................................................
Step 10
The flashing fault LED on the LNW71 (10/100-PL), or LNW66 (10/
100T) (R1.1) will clear and the response window of the command
builder should display the following.
............................................................................................................................................................................
Step 11
Connect the RJ45 cable to the next jack on the RJ45 patch panel and
repeat starting at Step 5 until all connected jacks have been tested.
...........................................................................................................................................................................
End of Steps
Ethernet port wiring verification testing.
Step 1
If not still connected serially from the last procedure then connect the
Front CIT cable between the PC and the CIT/RS 232 jack of System
Controller and login to the shelf using the serial connection and the
TL1/Command Builder options on WaveStar
TM
CIT.
............................................................................................................................................................................
Step 2
Click on the
ent-vlan
command.
............................................................................................................................................................................
Step 3
Under the
Parameters
section, click
fn-{d}-1
from the choices given
under the
<VLANAID>
column, click on the
{ 1 }
from the choices
given under the
<VLANVRTSWID>
column, and click on
DFEPLST=[& SEPARATED LIST]
from the choices given under the
<VLANSBENT>
column.
LT-DMXTEND 02-12-12 09:30:15
A 507 REPT ALM FELAN
"d-1:CL,LOS,SA,12-12,09-30-15:\"inc. FE-LAN LOS clrd\"