
Measuring
32
sufficient. If the measured value changes, reposition the probe until the measured
value remains unchanged.
Measurements without Probe:
If the structural layout makes it impossible to set a probe, the probe line may thus
be connected to the earthed/grounded neutral wire (N wire). As in this measuring
method the resistance of the system earth/ground connection (R
B
) is included in
the measurement, the measured value should be corrected by the formula
R
A
= R
measured
- R
B
As the system earthing/grounding resistance may be max. 2 Ohm as per DIN VDE
0100 and is known only rarely, it is recommended to ignore the system
earthing/grounding resistance. The measured value then includes the value of R
B
as an increased factor of safety.
Error Messages:
Flashing symbols on the display generally signify illegal conditions or errors,; for
further information see section 3.11 „Display hints“.
Summary of Contents for Saturn 100 Plus
Page 2: ......
Page 7: ...Initial power up 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 13: ...Measuring 11 Flowchart of operation...
Page 46: ...Information for the tester 44 4 2 Description of Function...
Page 71: ...Erste Inbetriebnahme 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 76: ...Messfunktionen 10 Flu diagramm f r Bedienung...
Page 107: ...Informationen zum Pr fger t 41 4 2 Funktionsbeschreibung...
Page 126: ...Service 60...
Page 131: ...Premi re mise en service 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 138: ...Directives d utilisation 12 Organigramme d utilisation...
Page 174: ...Informations 48 4 2 Les fonctions...
Page 199: ...Primo Avvio 6 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 204: ...Funzioni di misura 11 Diagramma di flusso per l utilizzo...
Page 263: ...Puesta en marcha 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 269: ...Medici n 11...