
Measuring
27
3.7.2 Testing Selective FI-Circuit Breakers (Types S+ G):
This measuring function serves to test the protective measures „Fault-current-
protection circuit“ when using selective (short-term delayed) and conditionally
surge-current-proof fault-current circuit breakers. It is possible to measure contact
voltage, earth/ground connection resistance or loop resistance as well as tripping
time at nominal fault currents of I
DN
10, 30, 100, 300 or 500 mA (for U
L-PE
< 152 V
only 10, 30, 100 mA).
For this measurement the same rules and notes apply as described in section
3.7.1. Therefore only the differences from the test of standard FI-circuit breakers
are explained below.
Measuring Process:
L 1 = brown
L 2 = black
L 3 = purple
Instrument
Marker
L3
L1
L2
L2
L1
L3
N
PE
(PEN)
L3
L1
L2
Instrument
Instrument
M
Connection for use with a probe
Probe
FI
R
B
> 20m
R
A
Observe overload capacity and connect instrument as shown.
Turn central selector in mode RCD to desired nominal fault current I
DN
.
Press key
n
n
n
n
„
S
, x5, “ until the symbol
S
is displayed.
Press key
T
„
“for measurement without tripping the
S
FI-circuit breakers.
Press key
R
„Start“.
For the check with tripping, a 30 s measuring pause is inserted after prechecking,
during which a countdown from 60 to 0 takes place on the display (see also „Notes
on the Measuring
Sequence“). This phase can be disabled by again pressing key
R
„Start“ t is,
however, essential for determining the true tripping time and must therefore not be
disabled for tripping-time measurements.
Read measured value, contact voltage „U
L
“. Repeated pressing of key
S
„Display” brings up the loop resistance „R
S
“, in case of use of a probe the
Summary of Contents for Saturn 100 Plus
Page 2: ......
Page 7: ...Initial power up 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 13: ...Measuring 11 Flowchart of operation...
Page 46: ...Information for the tester 44 4 2 Description of Function...
Page 71: ...Erste Inbetriebnahme 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 76: ...Messfunktionen 10 Flu diagramm f r Bedienung...
Page 107: ...Informationen zum Pr fger t 41 4 2 Funktionsbeschreibung...
Page 126: ...Service 60...
Page 131: ...Premi re mise en service 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 138: ...Directives d utilisation 12 Organigramme d utilisation...
Page 174: ...Informations 48 4 2 Les fonctions...
Page 199: ...Primo Avvio 6 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 204: ...Funzioni di misura 11 Diagramma di flusso per l utilizzo...
Page 263: ...Puesta en marcha 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 269: ...Medici n 11...