
Measuring
15
For using the 3-pole measuring lead observe the following:
If the symbol „
“appears, L
1
is connected to the higher potential. If the display
shows „
“L
2
is connected to the wire with the higher voltage with respect to the
reference point PE wire. Versions CH/GB:
L1, approx.
L2.
ATTENTION!
When using the 3-pole measuring lead, take care to have the
correct connection of the PE-wire to the mains, or else the specified
assignments are invalid!
It must not be assumed that there is no risk in
touching the other wires.
In position L-N no assignment is possible. In
combination with the display of the insulation resistance R
ISO
this signal
indicates the rigidly assigned L wire!
Summary of Contents for Saturn 100 Plus
Page 2: ......
Page 7: ...Initial power up 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 13: ...Measuring 11 Flowchart of operation...
Page 46: ...Information for the tester 44 4 2 Description of Function...
Page 71: ...Erste Inbetriebnahme 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 76: ...Messfunktionen 10 Flu diagramm f r Bedienung...
Page 107: ...Informationen zum Pr fger t 41 4 2 Funktionsbeschreibung...
Page 126: ...Service 60...
Page 131: ...Premi re mise en service 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 138: ...Directives d utilisation 12 Organigramme d utilisation...
Page 174: ...Informations 48 4 2 Les fonctions...
Page 199: ...Primo Avvio 6 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 204: ...Funzioni di misura 11 Diagramma di flusso per l utilizzo...
Page 263: ...Puesta en marcha 5 9 2 1 10 5 4 6 7 8 3 11 A 12...
Page 269: ...Medici n 11...