3
CRYOJANE TAPE-TRANSFER
STEP-BY-STEP
INSTALLATION INSTRUCTIONS
The following items are required for installation:
Absolute Alcohol
1600 Watt Hair Dryer
Gauze
Gloves
01 Remove release paper
from ECU
02 Place ECU on top left
corner of cryostat
03 Using absolute alcohol and gauze
clean chamber wall
04 Heat left wall for Mech &
Oil Bath placement
05 Place Oil Bath towards the
rear of the left chamber wall
06 Route Oil Bath & Mech Cables
underneath Mech
*07 Place Mech in Chamber.
Place Mech low in chamber
near the front wall.
(Placement near the freeze
bar is ideal in most cryostats)
08 Route cables in door bar
09 Place door bar with cables
onto front chamber ledge.
If required attach Door Bar Support Strip
underneath door bar