Product Service 1-800-522-7658
50
Section Three –
Installation
Now that the installation is properly prepared, you are ready to inspect, install, and
certify the Logic+ biosafety cabinet. This chapter covers how to:
Unpack and move the biosafety cabinet.
Install the cabinet.
Connect the electrical supply source.
Connect the service lines.
Connect to an exhaust system (optional for Type As).
Tools required for installation the biosafety cabinet include two 1/2" wrenches, a flat-
blade screwdriver, a #2 Phillips screwdriver, and a carpenter’s level.
Note: The biosafety cabinet models weigh between 400–700 lbs. (182-318 kg). The
shipping pallet allows for lifting with a mechanical lift truck or floor jack. If you must lift
the product manually, use at least six (6) persons and follow safe-lifting guidelines.