
3
INSTALLATION
20
OPTISYS SLM 2100
www.krohne.com
01/2017 - 4002737304 - MA OPTISYS SLM 2100 R04 en
Mounting frame
Mounting frame
Mounting frame
Mounting frame
The mounting frame can be used for round or rectangular handrails. For rectangular handrails
suitable rectangular brackets should be selected which are not part of the scope of delivery. Use
at least 3 fixation points as described in the installation of round handrails. For further
information refer to
Dimensions
on page 81.
Mounting frame with brackets with round handrail (vertical or horizontal)
Mounting frame with brackets with round handrail (vertical or horizontal)
Mounting frame with brackets with round handrail (vertical or horizontal)
Mounting frame with brackets with round handrail (vertical or horizontal)
This option allows installing the sludge level meter on many round handrails. The rod steel U-
bolts cover handrails between diameters of 33...60.3 mm / 1.3...2.37 inch. Two round rod steel U-
bolts fixate the mounting frame on the upper handrail. A further rod steel U-bolt stabilises the
sludge level meter by fixation to a horizontal or vertical bar.
Mounting on round handrail with horizontal bar
Mounting on round handrail with horizontal bar
Mounting on round handrail with horizontal bar
Mounting on round handrail with horizontal bar
•
Mount the frame using the rod steel U-bolts (M10) and nuts
1
in a position that the frame is
above the handrail.
Figure 3-3: Mounting of upper handrail
1
Rod steel U-bolts
Summary of Contents for OPTISYS SLM 2100
Page 85: ...NOTES 8 85 OPTISYS SLM 2100 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en ...
Page 86: ...8 NOTES 86 OPTISYS SLM 2100 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en ...
Page 87: ...NOTES 8 87 OPTISYS SLM 2100 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en ...