CONTENTS
3
www.krohne.com
08/2011 - 4000972602 - MA OPTISONIC 6400 R02 en
OPTISONIC 6400
1 Safety instructions
5
1.1 Intended use ..................................................................................................................... 5
1.2 Certification ...................................................................................................................... 5
1.3 Safety instructions from the manufacturer ..................................................................... 6
1.3.1 Copyright and data protection ................................................................................................ 6
1.3.2 Disclaimer ............................................................................................................................... 6
1.3.3 Product liability and warranty ................................................................................................ 7
1.3.4 Information concerning the documentation........................................................................... 7
1.3.5 Warnings and symbols used................................................................................................... 8
2 Device description
9
2.1 Scope of delivery............................................................................................................... 9
2.2 Nameplates .................................................................................................................... 10
3 Installation
12
3.1 General safety instructions ............................................................................................ 12
3.2 Installation requirements .............................................................................................. 13
3.2.1 Inlet, outlet and recommended mounting area ................................................................... 13
3.2.2 Long horizontal pipes ........................................................................................................... 14
3.2.3 Vertical pipelines .................................................................................................................. 14
3.2.4 Open feed or discharge......................................................................................................... 15
3.2.5 Down going pipeline over 5 m / 16 ft length ......................................................................... 15
3.2.6 Position of control valve........................................................................................................ 15
3.2.7 Position of pump ................................................................................................................... 16
3.3 Installation procedure for flow measurement .............................................................. 17
3.3.1 Step 1: check required parts ................................................................................................ 17
3.3.2 Step 2: select proper installation position ........................................................................... 18
3.3.3 Step 3: determine dimensions of pipe.................................................................................. 18
3.3.4 Step 4: initialise the UFC 400 P converter............................................................................ 18
3.3.5 Step 5: program the units in the converter .......................................................................... 19
3.3.6 Step 6: program the converter ............................................................................................. 20
3.3.7 Step 7: mount the sensor rails ............................................................................................. 21
3.3.8 Step 8: connect the sensor cable ......................................................................................... 27
3.3.9 Step 9: start flow measurement........................................................................................... 28
3.3.10 Error messages .................................................................................................................. 29
3.4 Installation procedure for energy measurement .......................................................... 31
3.4.1 Step 1: selecting the necessary tools for energy measurement ......................................... 32
3.4.2 Step 2: what to do before setting up the energy units ......................................................... 34
3.4.3 Step 3: setting up the units ................................................................................................... 35
3.4.4 Step 4: set up I/O input for energy measurement................................................................ 35
3.4.5 Step 5: Set up process input for energy measurement ....................................................... 35
3.4.6 Step 6: set up counters for energy ....................................................................................... 37
3.4.7 Step 7: How to read energy measurement........................................................................... 37
4 Electrical connections
39
4.1 Safety instructions.......................................................................................................... 39
4.2 Location of connectors at the converter ........................................................................ 39