INSTALLATION
3
17
OPTISONIC 6400
www.krohne.com
08/2011 - 4000972602 - MA OPTISONIC 6400 R02 en
3.3 Installation procedure for flow measurement
3.3.1 Step 1: check required parts
INFORMATION!
Check the packing list to check if you received completely all that you ordered.
INFORMATION!
Inspect the cartons carefully for damage or signs of rough handling. Report damage to the
carrier and to the local office of the manufacturer.
CAUTION!
The device arrives in a plastic trunk on wheels.
Figure 3-8: Scope of delivery
1
Product documentation, factory calibration report
2
Trunk on wheels
3
Carrying bag
4
1 or 2 rail(s) per tray
5
Metal / textile straps for mounting rail(s) and converter
6
Sensor(s) with fixing units (small version 1, medium version 2 sensors)
2 Transducers (small versions: 2 MHz, medium version: 1 MHz), including 3 m cable, coupling grease
7
Power adapter including plugs for EU, UK, US and AUS
8
USB memory stick, measure band
optionally I/O box and/or temperature sensors, PC connection cable
9
Signal converter UFC 400 P