4
START-UP
50
OPTISONIC 6300
www.krohne.com
06/2019 - 4005857501 - QS OPTISONIC 6300 v2 R01 en
•
Mount the DOWN rail in such a way that the transducer is at the marked location.
•
Grease all transducers, see "General mechanical installation".
The installation of the rails are (more or less) facing straight and metal straps are mounted
close beside each other.
Figure 4-6: Marking the opposite location
Calculate the middle of the alignment line between the 4 V-marks as shown.
Figure 4-7: Finding the location for the DOWN rail
1
Advised Distance as shown in menu X7.4
2
Measure the distance between the transducer and the end of the UP rail.
3
Determine and mark the location of the transducer of the DOWN rail:
3
3
3
3
=
1
1
1
1
-
2
2
2
2
INFORMATION!
It can be necessary to install the DOWN rail as shown below.
Figure 4-8: Transducers almost opposite, distance small
1