REMARK
When slinging a load with 2 or more ropes, the force sub-
jected to each rope increases with the hanging angle. The
figure below shows the variation of allowable load in kN
{kg} when slinging is made with 2 ropes, each of which is
allowed to sling up to 9.8 kN {1000 kg} vertically, at vari-
ous hanging angles. When the 2 ropes sling a load verti-
cally, they can sling up to 2000 kg of total weight. This
weight is reduced to 1000 kg when the 2 ropes make a
hanging angle of 120 °. If the 2 ropes sling a 2000 kg load
at a hanging angle of 150 °, each rope is subjected to a
force as large as 39.2 kN {4000 kg} .
• When installing wire ropes to an angular load, apply pads to protect the wire ropes. If the load is slippery,
apply proper material to prevent the wire rope from slipping.
• Use the specified eye bolts and fix wire ropes, chains, etc. to them with shackles, etc.
• Apply wire ropes to the middle part of the hook.
k
Do not use hooks if it does not have a latch sys-
tem.
k
Slinging near the tip of the hook may cause the
rope to slip off the hook during hoisting.
REMARK
The strength of the hook is maximum at its central part.
• Never use a wire rope which has breaks in strands (A), re-
duced diameter (B), or kinks (C). There is a danger that
the rope may break during the towing operation.
Precautions for slinging up
• Wind in the crane slowly until wire ropes are stretched.
When settling the wire ropes with the hand, do not grasp
them but press them from above. If you grasp them, your
fingers may be caught.
• After the wire ropes are stretched, stop the crane and
check the condition of the slung load, wire ropes, and
pads.
• If the load is unstable or the wire rope or chains are twisted, lower the load and lift it up again.
• Do not lift up the load at an angle.
Precautions for slinging down
• When slinging down a load, stop it temporarily at 30 cm above the floor, and then lower it slowly.
• Check that the load is stable, and then remove the sling.
• Remove kinks and dirt from the wire ropes and chains used for the sling work, and put them in the specified
place.
Precautions for using mobile crane
REMARK
Read Operation and Maintenance Manual of the crane carefully in advance and operate the crane safely.
Precautions for using overhead traveling crane
k
When raising a heavy component (heavier than 25 kg), use a hoist or crane.
SAFETY NOTICE FOR OPERATION
00 INDEX AND FOREWORD
00-18
PC500LC-10R
Summary of Contents for PC500LC-10R
Page 1: ...HYDRAULIC EXCAVATOR SEN06722 00 PC500LC 10R SERIAL NUMBERS 100001 and up...
Page 2: ......
Page 3: ...00 INDEX AND FOREWORD PC500LC 10R 00 1...
Page 76: ......
Page 77: ...01 SPECIFICATIONS PC500LC 10R 01 1...
Page 94: ......
Page 95: ...10 STRUCTURE AND FUNCTION PC500LC 10R 10 1...
Page 177: ...When balanced 10 STRUCTURE AND FUNCTION CLSS PC500LC 10R 10 83...
Page 178: ...When lever is returned to fine control state CLSS 10 STRUCTURE AND FUNCTION 10 84 PC500LC 10R...
Page 179: ...When lever is pulled at a stroke 10 STRUCTURE AND FUNCTION CLSS PC500LC 10R 10 85...
Page 180: ...When lever is in stroke end CLSS 10 STRUCTURE AND FUNCTION 10 86 PC500LC 10R...
Page 377: ...20 STANDARD VALUE TABLE PC500LC 10R 20 1...
Page 407: ...30 TESTING AND ADJUSTING PC500LC 10R 30 1...
Page 583: ...30 TESTING AND ADJUSTING METHOD FOR STARTING UP KOMTRAX TERMINAL PC500LC 10R 30 177...
Page 604: ......
Page 605: ...60 MAINTENANCE STANDARD PC500LC 10R 60 1...
Page 636: ...MAINTENANCE STANDARD OF MAIN PUMP 60 MAINTENANCE STANDARD 60 32 PC500LC 10R...
Page 638: ...MAINTENANCE STANDARD OF SWING MOTOR 60 MAINTENANCE STANDARD 60 34 PC500LC 10R...
Page 641: ...60 MAINTENANCE STANDARD MAINTENANCE STANDARD OF TRAVEL MOTOR PC500LC 10R 60 37...
Page 644: ...MAINTENANCE STANDARD OF CONTROL VALVE 60 MAINTENANCE STANDARD 60 40 PC500LC 10R...
Page 646: ...MAINTENANCE STANDARD OF CONTROL VALVE 60 MAINTENANCE STANDARD 60 42 PC500LC 10R...
Page 648: ...MAINTENANCE STANDARD OF CONTROL VALVE 60 MAINTENANCE STANDARD 60 44 PC500LC 10R...
Page 650: ...MAINTENANCE STANDARD OF CONTROL VALVE 60 MAINTENANCE STANDARD 60 46 PC500LC 10R...
Page 652: ...MAINTENANCE STANDARD OF CONTROL VALVE 60 MAINTENANCE STANDARD 60 48 PC500LC 10R...
Page 658: ...MAINTENANCE STANDARD OF TRAVEL PPC VALVE 60 MAINTENANCE STANDARD 60 54 PC500LC 10R...
Page 668: ...MAINTENANCE STANDARD OF WORK EQUIPMENT LINKAGE 60 MAINTENANCE STANDARD 60 64 PC500LC 10R...
Page 679: ...90 CIRCUIT DIAGRAMS PC500LC 10R 90 1...
Page 692: ......
Page 694: ......
Page 696: ......
Page 698: ......
Page 700: ......
Page 704: ...Symbol Content Buzzer Antenna SYMBOLS USED IN ELECTRICAL CIRCUIT DIAGRAM 90 26 PC500LC 10R...
Page 706: ......
Page 708: ......
Page 710: ......
Page 712: ......
Page 714: ......
Page 716: ......
Page 718: ......
Page 720: ......
Page 722: ......
Page 724: ......
Page 726: ......
Page 728: ......
Page 730: ......
Page 732: ......
Page 734: ......
Page 736: ......
Page 738: ......
Page 740: ......
Page 742: ......
Page 744: ......
Page 746: ......
Page 748: ......
Page 757: ......