TRANSPORTATION
OPERATION
3-106
PROCEDURE FOR LIFTING OPERATIONS
q
Hang the front wire ropes to each cylinder support (1) on the right and left sides.
q
Fit the wire ropes at the rear to both left and the right pivot shafts (2).
For machine equipped with ripper
q
Fit the wire ropes at the center to both left and the right pivot shafts (2).
q
Hang the rear wire rope to ripper beam (3).
When lifting the machine, stop it on a level place, then observe the following procedure.
Summary of Contents for 69001
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 24: ...CONTENTS 1 22 ...
Page 54: ...PRECAUTIONS FOR MACHINE SAFETY 2 30 ...
Page 177: ...OPERATION TROUBLESHOOTING 3 123 ...
Page 178: ...TROUBLESHOOTING OPERATION 3 124 ...
Page 253: ...SPECIFICATIONS 15 ...
Page 270: ...EQUIPPING FIRE EXTINGUISHER AND FIRST AID KIT ATTACHMENTS OPTIONS 6 16 ...
Page 271: ...INDEX 17 ...
Page 272: ...INDEX 7 2 ...
Page 275: ...COLOPHON 18 ...