HANDLING HYDRAULIC RIPPER
ATTACHMENTS, OPTIONS
6-6
When changing the digging depth, do as follows.
1.
Remove cotter pin (1).
2.
Remove pin (2), change the position of the shank hole,
then insert pin (2).
3.
Insert cotter pin (1).
ADJUSTING DIGGING ANGLE
Adjust the position of the mounting pin hole in the beam and
upper link.
q
Digging angle
Position (1): 45°
Position (2): 55°
The pin is locked with lock plate (3).
REPLACEMENT OF POINT
A point is installed to protect the shank. If the point is worn,
replace it as follows.
1.
Put a pin remover in contact with the pin marked by the
arrow and tap with a hammer to remove.
2.
Replace the point.
3.
Insert the pin half way, then knock it in fully with a hammer.
Summary of Contents for 69001
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 24: ...CONTENTS 1 22 ...
Page 54: ...PRECAUTIONS FOR MACHINE SAFETY 2 30 ...
Page 177: ...OPERATION TROUBLESHOOTING 3 123 ...
Page 178: ...TROUBLESHOOTING OPERATION 3 124 ...
Page 253: ...SPECIFICATIONS 15 ...
Page 270: ...EQUIPPING FIRE EXTINGUISHER AND FIRST AID KIT ATTACHMENTS OPTIONS 6 16 ...
Page 271: ...INDEX 17 ...
Page 272: ...INDEX 7 2 ...
Page 275: ...COLOPHON 18 ...