MAINTENANCE
SERVICE PROCEDURE
4-41
ADJUSTMENT
1.
Travel for 1 or 2 meters on flat ground, then measure clear-
ance (A) between track frame (1) and guide plate (2) (4
places: left, right, inside, outside).
2.
If the clearance (A) exceeds 4.0 mm, loosen bolt (3), and
pull out the shim to adjust the clearance at one end to 0.5
to 1.0 mm.
Thickness of one shim is 1.0 mm.
LUBRICATING UNIVERSAL JOINT
4
WARNING
The undercover is heavy. Never try to open or close the cover when directly beneath it. When removing
bolts (2), carry out the work from the rear of the cover so that you can easily get out of the way.
1.
Remove the undercover from the rear bottom of the
machine body as follows.
2.
Remove two bolts (1) from the front side of the machine
body.
3.
Holding the cover, remove two bolts (2) from the rear side
of the machine body.
4.
Lower and open the cover gradually.
(A) Front of machine
(B) Dangerous place
5.
Apply grease to the grease fittings (2 places) shown by
arrows.
Summary of Contents for 69001
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 24: ...CONTENTS 1 22 ...
Page 54: ...PRECAUTIONS FOR MACHINE SAFETY 2 30 ...
Page 177: ...OPERATION TROUBLESHOOTING 3 123 ...
Page 178: ...TROUBLESHOOTING OPERATION 3 124 ...
Page 253: ...SPECIFICATIONS 15 ...
Page 270: ...EQUIPPING FIRE EXTINGUISHER AND FIRST AID KIT ATTACHMENTS OPTIONS 6 16 ...
Page 271: ...INDEX 17 ...
Page 272: ...INDEX 7 2 ...
Page 275: ...COLOPHON 18 ...