Doing the Water Leak Test
981088 – September 1995
57
Warning
Dangerous Voltage
[20] De-energize the PROCESSOR by moving the MAIN CIRCUIT BREAKER CB1 to the “O” position.
[21] Disconnect the main power supply from the PROCESSOR.
[22] Check for leaks under the TANKS by doing Steps 6 through 11 on Page 55.
[23] Energize the PROCESSOR by moving the MAIN CIRCUIT BREAKER CB1 to the “1” position.
[24] For all installations, continue with section “Setting the Developer Temperature” on Page 58.