Installing the PROCESSOR
981088 – September 1995
15
Preparing the MOUNTING STAND
[3] Install on the MOUNTING STAND the 4 LEVELING FEET and 4 LOCK NUTS that were packed with the
MOUNTING STAND.
Important
If you will be securing the MOUNTING STAND with SEISMIC BRACKETS, ensure that the LEVELING FEET
extend past the bottom of the MOUNTING STAND by no more than 2.5 cm (1 in.).
[4] Rotate the LEVELING FEET until the FEET extend past the MOUNTING STAND by 3.75 cm (1
1
⁄
2
in.).
Important
If you will be securing the MOUNTING STAND with SEISMIC BRACKETS, place the 4 FLOOR PLATES
provided with the SEISMIC BRACKET KIT 261413 under the 4 LEVELING FEET of the MOUNTING STAND.
[5] Install the 4 FLOOR PLATES under the 4 LEVELING FEET of the MOUNTING STAND.
Figure 9
Installing FLOOR PLATES under the MOUNTING STAND
H130_0091DA
H130_0091DCC
SEISMIC BRACKET (4)
for the MOUNTING
STAND
LEVELING
PLATE (4)
FOOT (4)
FLOOR