Doing the Water Leak Test
981088 – September 1995
55
Figure 47
Checking for Leaks Behind the
ELECTRICAL BOX
[4] Check that the PROCESSOR is still level when it
is full of solution. See the procedure on Page 47.
Leveling the PROCESSOR correctly will ensure:
• the correct flow of the processing solutions
• the correct transport of the film
• the correct fit of all ACCESS PANELS
[5] Check for leaks at all connections. Tighten HOSE
CLAMPS as necessary.
[6] Pull out the SUPPORT SHELF for the
ELECTRICAL BOX from the drive side of the
PROCESSOR.
[7] Pull out the ELECTRICAL BOX.
[8] Using a FLASHLIGHT, check for leaks behind
the ELECTRICAL BOX. Tighten HOSE
CLAMPS, as necessary.
[9] Push the SUPPORT SHELF and the
ELECTRICAL BOX to their original positions.
[10] Turn on the main water supply to the
PROCESSOR.
Warning
Dangerous Voltage
[11] Connect the main power to the PROCESSOR.
[12] Rotate the DRYER TEMPERATURE
CONTROL KNOB on the DISPLAY PANEL
fully counterclockwise
.
Figure 48
Identifying Components
on the DISPLAY PANEL
H130_0151CA
SHELF
SUPPORT
H130_0151CCA
ELECTRICAL
BOX
+
-
Ready
Wait
Service
Dryer
Temperature
H130_0003AA
H130_0003ACE
CONTROL KNOB
DRYER TEMPERATURE
BREAKER CB1
MAIN CIRCUIT