Chapter 6. Defining Study Setups
6.3 The Define Setup Screen (cont.)
Here you define the setup for a study. Use the text boxes or drop-down lists to enter:
•
the Setup Name
•
the Number of Sensors
•
the Vessel ID
•
the SOP (Standard Operating Procedure) Protocol Number
•
the Load Description
•
any Comments you wish to add.
Note:
The Setup name, Study type, and Number of sensors fields are mandatory.
The Setup Name and Comment fields can accept alphanumeric characters and blanks, while
the Vessel ID, Load Description and SOP fields can also accept special characters (hyphen,
underscore, forward and backward slash.)
When you have completed entering asset data, press the
Sensors Configuration
button at
the upper right to continue.
62
Kaye Validator User’s Manual
Summary of Contents for Validator AVS
Page 1: ...Validation Kaye Validator AVS User s Manual Kaye Validator User s Manual...
Page 2: ...Kaye Validator AVS Thermal Process Validation System User s Manual M5100 EN Rev A May 2015...
Page 3: ...No content intended for this page Kaye Validator User s Manual...
Page 133: ...Chapter 10 Generating Reports 126 Kaye Validator User s Manual...
Page 138: ...Chapter 10 Generating Reports Kaye Validator User s Manual 131...
Page 147: ...Chapter 10 Generating Reports 140 Kaye Validator User s Manual...
Page 167: ...No content intended for this page...