Installation
Spirit200a User’s Manual Rev J
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
3-11
Torch Gas Connections
Perform the following steps to connect the torch gas hoses to the
automatic gas console, torch base, and torch valve assemblies. See
figure below.
Note: When making hose connections, only tighten the brass
fittings enough to make gas seals. The fittings are
subject to damage if over tightened.
7.5 Foot Shield Gas Hose
1. Route one end of the 7.5 foot (2.3 m) shield gas hose through the torch
handle and connect to the shield gas fitting on the torch base.
2. Connect the other end of the 7.5 foot (2.3 m) shield gas hose to the
shield gas outlet on the 5-gang manifold.
15 Inch Plasma Gas Hose
1. Route one end of the 15 inch (380 mm) plasma gas hose through the
torch handle and connect to the plasma gas fitting on the torch base.
2. Thread the torch handle onto the torch base, being careful not to twist
the torch leads and gas hoses when tightening the torch handle.
3. Tighten the base to the handle using a pin style adjustable spanner
wrench (fits 2" diameter with ¼" diameter pin).
4. Attach the 2-gang manifold assembly to the torch handle. The top of
the manifold bracket should be flush with the top of the torch handle.
5. Mount the torch handle/base/manifold to the positioner. Note the
alignment indicators on the torch base (slot) and torch head (small
circle). These aid in aligning the quick-disconnect torch base and head
and should be oriented so they are clearly visible when the operator is
changing heads.
6. Connect the other end of the 15 inch (380 mm) plasma gas hose to the
plasma gas outlet on the 2-gang manifold.
6 Foot Preflow/Postflow/Marking Gas Hose
1. Connect one end of the 6 foot (1.8 m) preflow/postflow/marking gas
hose to the preflow/postflow/marking outlet on the 5-gang manifold.
2. Connect the other end of the 6 foot (1.8 m) preflow/postflow/marking
gas hose to the preflow/postflow/marking inlet on the 2-gang manifold.
Marking Gas Hose
1. Connect one end of the marking gas hose to the marking outlet on the
rear of the AGC.
2. Connect the other end of the marking hose to the marking inlet on the
5-gang torch valve assembly.
14
15
16
17