Figure 109: Pulling the MX2010 into the Rack
g000068
NOTE:
A four-person team is needed to carefully guide the router into the rack while
operating the winch.
NOTE:
If the router is not pulled all the way into the rack by the winch mechanism, grasp
the handles on the shipping covers and carefully slide the router onto the mounting shelf
until the front-mounting flanges contact the rack rails. You must remove the winch bracket
to perform this procedure.
NOTE:
There must be a minimum of 45-U of usable rack space when installing the MX2010
into a 45-U rack.
11. Remove the router transport platform, and set the platform aside.
269
Summary of Contents for MX2010
Page 1: ...MX2010 Universal Routing Platform Hardware Guide Published 2019 12 03...
Page 28: ......
Page 30: ...MX2010 Power System Description 95 MX2010 Cooling System Description 45 4...
Page 144: ...MX2010 DC Power 48 V System Electrical Specifications 201 122...
Page 146: ......
Page 233: ......
Page 273: ...Figure 98 Loading the MX2010 Router into the Rack g007436 256...
Page 294: ...Figure 113 Reinstalling an AC Power Distribution Module g007440 D 277...
Page 295: ...Figure 114 Reinstalling a DC Power Distribution Module 48 V D g007432 278...
Page 373: ...4 PART Installing and Replacing Components Installing Components 359 Replacing Components 429...
Page 374: ......
Page 620: ......
Page 715: ...6 PART Troubleshooting Hardware Troubleshooting Components 703...
Page 716: ......
Page 744: ......
Page 772: ......
Page 775: ...763...
Page 783: ...772...
Page 796: ...Jewelry Removal Warning 787...
Page 799: ...Operating Temperature Warning 790...
Page 808: ...DC Power Disconnection Warning 799...
Page 812: ...DC Power Wiring Sequence Warning 803...