Figure 192: Installing an MX2008 Router DC Power Supply Module
4. Verify that the INP0 and/or INP1 LEDs on the PSM are lit green steadily (see
).
NOTE:
If you are connecting two feeds, INP0 and INP1, both LEDs on the PSM will be
lit green steadily.
5. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
6. Move the switch to the on (|) position.
7. Verify that the PWR OK LED is lit green steadily. See MX2020 DC and Power Supply Module LEDs,
“MX2010 DC Power Supply Module LEDs” on page 121
, or MX2008 DC Power Supply Module LEDs for
information on PSM LED behavior.
8. Repeat Steps
through
for installing PSMs in slots 0, 1, and 2, where required.
409
Summary of Contents for MX2010
Page 1: ...MX2010 Universal Routing Platform Hardware Guide Published 2019 12 03...
Page 28: ......
Page 30: ...MX2010 Power System Description 95 MX2010 Cooling System Description 45 4...
Page 144: ...MX2010 DC Power 48 V System Electrical Specifications 201 122...
Page 146: ......
Page 233: ......
Page 273: ...Figure 98 Loading the MX2010 Router into the Rack g007436 256...
Page 294: ...Figure 113 Reinstalling an AC Power Distribution Module g007440 D 277...
Page 295: ...Figure 114 Reinstalling a DC Power Distribution Module 48 V D g007432 278...
Page 373: ...4 PART Installing and Replacing Components Installing Components 359 Replacing Components 429...
Page 374: ......
Page 620: ......
Page 715: ...6 PART Troubleshooting Hardware Troubleshooting Components 703...
Page 716: ......
Page 744: ......
Page 772: ......
Page 775: ...763...
Page 783: ...772...
Page 796: ...Jewelry Removal Warning 787...
Page 799: ...Operating Temperature Warning 790...
Page 808: ...DC Power Disconnection Warning 799...
Page 812: ...DC Power Wiring Sequence Warning 803...