6-27
Section 6 Target Tracking and AIS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Memo
•
If the speed or course of the own ship is changed or a new reference target is set, the
displayed speed may take 3 minutes or more to reach the specified speed after the
speed/course change or the setting.
Even after 3 minutes or more has passed, the speed may differ from the specified speed
depending on the tracking condition.
•
If the reference target is lost or the Target Tracking function is stopped, the ship speed against
the ground will be GPS. (Only if the GPS is equipped.).
•
If the reference target is lost or the Target Tracking function is stopped, that will make a major
impact on the accuracy of the target tracking and the own ship speed.
•
The reference targets are only used for the calculation of true speed.
•
Only one target can be set as a reference target. When a new reference target is set, the
previous reference target is cancelled.
6.5.8 Operation test for target tracking
Simulation is a function for determining if the target tracking function is working
correctly or not. Accordingly, this function should be used only to check for the target
tracking function operation.
In particular, if this mode is used during navigation, a pseudo target will appear on the
radar screen and cannot be easily identified from the real target. This may cause such
an accident as collision. Do not use this mode during the navigation.
The following operation test and checking are performed to check the operation of target tracking as
required. The [TT Test] dialogue is used for operation.
[Operation procedure]
Open the Target Tracking Test dialogue by performing the following operations.
[Menu] button
→
Settings
→
TT Test
Summary of Contents for JMR-5410-4X
Page 2: ......
Page 25: ...xxiii NKE 2255 7 9 6HS Scanner Unit Warning Label ...
Page 27: ...xxv NKE 2103 4 4HS Scanner Unit NKE 2103 6 6HS Scanner Unit NKE 2255 7 9 6HS Scanner Unit ...
Page 54: ...Contents 20 ...
Page 68: ...Section 1 Overview 1 14 Outline Drawing of Radar Antenna NKE 2632 A ...
Page 70: ...Section 1 Overview 1 16 Outline Drawing of Radar Antenna NKE 2043 NKE 2043 ...
Page 72: ...Section 1 Overview 1 18 Outline Drawing of Radar Antenna NKE 2103 4 4HS ...
Page 74: ...Section 1 Overview 1 20 Outline Drawing of Radar Antenna NKE 2255 7 ...
Page 76: ...Section 1 Overview 1 22 Outline Drawing of Radar Antenna NKE 2255 6HS ...
Page 78: ...Section 1 Overview 1 24 Outline drawing of 19inch Display NWZ 214 NWZ 214 ...
Page 80: ...Section 1 Overview 1 26 Outline Drawing of Process Unit NDC 1678 NDC 1678 ...
Page 82: ...Section 1 Overview 1 28 Outline Drawing of Trackball Operation Unit NCE 5605 Option ...
Page 84: ...Section 1 Overview 1 30 Outline Drawing of Junction Box NQE 1143 ...
Page 86: ...Section 1 Overview 1 32 Outline Drawing of 19inch Desktop Frame CWB 1659 ...
Page 88: ...Section 1 Overview 1 34 Outline Drawing of Interswitch Unit NQE 3141 8A Option ...
Page 126: ......
Page 214: ...Section 4 Range and Bearing Measurement Methods 4 32 ...
Page 244: ...Section 5 Basic Operation of the Radar 5 30 ...
Page 324: ...Section 8 Monitoring a Dragging Anchor 8 8 ...
Page 374: ...Section 11 Setting up Screen View 11 20 ...
Page 520: ...Section 15 Maintenance Inspection 15 70 ...
Page 546: ...Section 16 Failures and After Sale Services 16 26 ...
Page 590: ...Appendix A Radar Antenna Display Unit Block Diagrams A 8 A 1 8 NKE 2255 7 9 6HS ...
Page 592: ...Appendix A Radar Antenna Display Unit Block Diagrams A 10 A 1 10 NKE 2063A ...
Page 596: ...Appendix A Radar Antenna Display Unit Block Diagrams A 14 A 2 3 NCE 5794 operation unit ...
Page 622: ...Appendix D Menu List and Materials D 8 Tools VHF Call VHF1 Call VHF2 Call VHF3 Call ...
Page 687: ......