Section 3 Common Basic Operations
3-24
3.13.3.2 Setting up the measurement starting points
The measurement starting points of the EBL/VRM in operation can be changed. Set up the
measurement starting points as usage.
1
Enable the manipulation of EBL/VRM by clicking on the EBL/VRM button.
The display of the clicked button changes from [Off] to the bearing presentation of the
measurement starting point.
2
Click on the Measurement Starting Point button of the EBL/VRM in the operational
state.
Each time this button is clicked on, the measurement starting point switches in the order of blank
field
→
[C]
→
[D]
→
blank field and so on.
Blank field (CCRP): Sets the measurement starting point to the own ship position (CCRP).
C (Carried): Fixes the measurement starting point on the screen.
D (Dropped): Fixes the measurement starting point at longitude and latitude point.
Memo
In the case of [D], it is necessary to connect a navigation unit.
3.13.3.3 Setting the EBL bearing to True/Relative display
The EBL bearing True/Relative display can be changed by using the True/Relative button of EBL of the
Navigation Tool (measuring tools).
Setting the EBL numeric value display mode
1
Click on the true/relative button of EBL bearing.
Each time the button is clicked on, display switches between [T]
→
[R]
→
[T] in this order.
[T]: Displays EBL bearing in true bearing.
[R]: Displays EBL bearing in relative bearing.
Memo
The true/relative presentation of EBL bearing is common between EBL1 and EBL2.
Measurement starting point button
True/relative button of EBL bearing
Summary of Contents for JMR-5410-4X
Page 2: ......
Page 25: ...xxiii NKE 2255 7 9 6HS Scanner Unit Warning Label ...
Page 27: ...xxv NKE 2103 4 4HS Scanner Unit NKE 2103 6 6HS Scanner Unit NKE 2255 7 9 6HS Scanner Unit ...
Page 54: ...Contents 20 ...
Page 68: ...Section 1 Overview 1 14 Outline Drawing of Radar Antenna NKE 2632 A ...
Page 70: ...Section 1 Overview 1 16 Outline Drawing of Radar Antenna NKE 2043 NKE 2043 ...
Page 72: ...Section 1 Overview 1 18 Outline Drawing of Radar Antenna NKE 2103 4 4HS ...
Page 74: ...Section 1 Overview 1 20 Outline Drawing of Radar Antenna NKE 2255 7 ...
Page 76: ...Section 1 Overview 1 22 Outline Drawing of Radar Antenna NKE 2255 6HS ...
Page 78: ...Section 1 Overview 1 24 Outline drawing of 19inch Display NWZ 214 NWZ 214 ...
Page 80: ...Section 1 Overview 1 26 Outline Drawing of Process Unit NDC 1678 NDC 1678 ...
Page 82: ...Section 1 Overview 1 28 Outline Drawing of Trackball Operation Unit NCE 5605 Option ...
Page 84: ...Section 1 Overview 1 30 Outline Drawing of Junction Box NQE 1143 ...
Page 86: ...Section 1 Overview 1 32 Outline Drawing of 19inch Desktop Frame CWB 1659 ...
Page 88: ...Section 1 Overview 1 34 Outline Drawing of Interswitch Unit NQE 3141 8A Option ...
Page 126: ......
Page 214: ...Section 4 Range and Bearing Measurement Methods 4 32 ...
Page 244: ...Section 5 Basic Operation of the Radar 5 30 ...
Page 324: ...Section 8 Monitoring a Dragging Anchor 8 8 ...
Page 374: ...Section 11 Setting up Screen View 11 20 ...
Page 520: ...Section 15 Maintenance Inspection 15 70 ...
Page 546: ...Section 16 Failures and After Sale Services 16 26 ...
Page 590: ...Appendix A Radar Antenna Display Unit Block Diagrams A 8 A 1 8 NKE 2255 7 9 6HS ...
Page 592: ...Appendix A Radar Antenna Display Unit Block Diagrams A 10 A 1 10 NKE 2063A ...
Page 596: ...Appendix A Radar Antenna Display Unit Block Diagrams A 14 A 2 3 NCE 5794 operation unit ...
Page 622: ...Appendix D Menu List and Materials D 8 Tools VHF Call VHF1 Call VHF2 Call VHF3 Call ...
Page 687: ......