22
4-7
ROTOR HEAD INSTALLATION
3 x 18 mm Socket Head Bolt
.......... 1 pc
3 mm Lock Nut
.................................... 1 pc
Rotor Head Assembly
3 x 18 mm Socket
Head Bolt
Note: Be sure to engage the rotor hub pin into the washout
base groove before securing the rotor head in place.
3 mm Lock Nut
4-8
FLYBAR INSTALLATION
* Be sure to insert flybar bushings into
the seesaw shaft before inserting flybar.
Check to make sure the 2 flybar control arms are
parallel to the center line of the flybar.
*Flybar Bushings (2)
Use Threadlock
Seesaw Shaft
4 x 4 mm Set Screw (2)
Flybar Control Arm (2)
Center Line
Use blue Threadlock
4 x 4 mm Set Screw
.............. 2 pcs
Flybar Bushings
Note: Center the flybar in the seesaw shaft before securing the 2 flybar control arms.
Flybar Centering
............ 2 pcs
Flybar Control Arm
.... 2 pcs
Use Threadlock
Flybar
233.5 mm
233.5 mm
JRP9012.46 Robinson R22 Manual 10/6/00 5:05 PM Page 22