136
Fig.205
⑾
The tightening screw of output shaft mid-bearing seat is screwed off. The output shaft mid-bearing seat
and the output shaft are taken out.
The differential assembly is taken out.
The reverse speed fork assembly and the support are removed.
Installation
Fig.206
The process of transmission installation is basically reversal process of its dismantlement. But the
following points must be noticed:
1.
When the differential assembly is installed on the clutch housing, the output flange will be not installed
temporarily.
2.
The output assembly is installed. And the output shaft mid-bearing seat is set. The tightening screw is
inserted. The screw is screwed down with 40Nm of force moment.
3.
When the bearing retainer ring and needle bearing are installed, it is important to notice the direction of
the bearing retainer ring. The bore diameter of bearing retainer ring is fit with the bearing seat.
Fig.207
4.
When the 1st and 2nd speed synchronizer is installed, the teethed side is to face 1st speed driven gear.