![background image](http://html1.mh-extra.com/html/jabiru/2200/2200_instruction-and-maintenance-manual_3119579097.webp)
Jabiru Aircraft
Pty Ltd
Instruction & Maintenance Manual
Jabiru 2200 Aircraft Engine
Hydraulic Valve Lifter Models
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
REVISION
0
1
2
3
4
5
6 7
8
9
Dated : June 2010
Issued By: DPS
Page: 97 of 116
L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx
10.3 Run-In Checks
1. Preliminary
Paperwork Complete
Sufficient Fuel
Correct Oil Level
All Connections Correct and Secure
2. Start Run
Start Time
_____________
End Time
_____________
3. Ignition Checks (repeat a couple of times for each side)
Left Side
1000/2000 rpm
Right Side
1000/2000 rpm
4. Oil Leaks
Check Visually
5. Instruments
Working and Correct Range
6. Idle
Check idle screw (3/4 to 1 turn out)
7. General Running
Smoothness
Noises
Manifold Sealing
8. Oil Pressure and Temp
9. Check Ignition light to Tacho Test Rig (Top End RPM)
10. Check alternator Charging Voltage
10.4 Jabiru 2200
– Engine Post Run Procedure
SIGN
DATE
1. Heads retorqued 32 Nm (24 ft/lb). Valves Adjusted.
2. Check induction/exhaust bolts.
3. Any changes to be made.
4. Rerun, check for oil leaks and/or any modifications
made (oil pressure/leaks etc).
5. Check charging rate of alternator Volts
6. Leak Down
80
80
80
80
Cyl 1
2
3
4
7. Check all paper work
8. Drain fuel/oil. Prepare for Shipment.