INSTALLATION / HANDLING
32
SL, SM & SH 90, 110, 132, 150, 200, 250 &300 (50Hz)
L, H & HH 125, 150, 200, 250, 300, 350 & 400 (60Hz)
WC 60Hz
Sheet 1
Revision 02
39902341
125–200HP
WC 60Hz
KEY
A
Starter box door clearance area
B
Cooling air exhaust
C
Air intake
D
Starter box
E
1” NPT Breather piping connection
F
1
/
2
” NPT Aftercooler solenoid condensate drain
G
1
/
4
” NPT Aftercooler manual condensate drain
H
1
/
4
” NPT Intercooler manual condensate drain
J
1
/
2
” NPT Intercooler solenoid condensate drain
K
Seal vent opening – do not plug
M
Fork lift truck channels
N
2” NPT Water out
P
2” NPT Water in
S
2” NPT Air discharge
T
Power inlet location for conduit