![Ingersoll-Rand Sierra H 125 Operation And Maintenance Manual Download Page 3](http://html1.mh-extra.com/html/ingersoll-rand/sierra-h-125/sierra-h-125_operation-and-maintenance-manual_2059183003.webp)
U.K. PRESSURE SYSTEM REGULATIONS – FINAL IMPLEMENTATION 1 JULY 1994
SL, SM & SH 90, 110, 132, 150, 200, 250 &300 (50Hz)
L, H & HH 125, 150, 200, 250, 300, 350 & 400 (60Hz)
COMPONENT
CURRENT
INFORMATION
REVISED
INFORMATION
COMMENT
Pressure vessel.
F59 form (U.K. only)
As required, detailed
examination by local /
national legislation.
As required, detailed
examination by local /
national legislation.
1 year – Fully inspect
all external surfaces,
welds and fittings;
. report any excessive
corrosion, mechanical
or impact damage.
. report any leakage
or other deterioration.
6 year – Remove lid
and any necessary
fittings.
. Fully clean out.
. Fully inspect all
internal surfaces and
welds.
F59 regulation ended
1 July 1994.
Change.
Not applicable to this
compressor unless for
special order.
Pressure gauge.
2 year – Remove and
calibrate.
1 year – Remove and
calibrate.
Not applicable to this
compressor
Pressure regulator.
–
1 year – Check correct
function.
Not applicable to this
compressor
Filters, valves and
hoses.
6 months
–
No change (Maximum
recommended 1 year.