
96
RT-SVD03L-EN
Table 68.
Voyager
™
™
Light Commercial 12.5 to 17.5 tons MZVAV eFlex
™
™
Test Step
Supply
Fan %
Output
IGV
Output
Econ
VSPD
Comp
Capacity
Output
Fixed
Comp 1
Fixed
Comp 2
Outdoor
Fan PWM
Output
VAV
Box
Test Step
Resistance
(Ohms)
IGV Open
Test
0% (Fan
State: Off)
0%
(a)
Closed
0%
OFF
OFF
0%
ON
2.2k
IGV Close
Test
0% (Fan
State: Off)
0%
Closed
0%
OFF
OFF
0%
ON
3.3k
Fan On
In-Control
(b)
N/A
MIN
0%
OFF
OFF
0%
ON
4.7k
Econ
In-Control
N/A
OPEN
0%
OFF
OFF
0%
ON
6.8k
Cool 1
In-Control
N/A
MIN
50%
OFF
OFF
(c)
ON
10k
Cool 2
In-Control
N/A
MIN
100%
ON
OFF
(c)
ON
15k
Cool 3
In-Control
N/A
MIN
100%
ON
ON
(c)
ON
22k
Heat 1
100%
(c)
N/A
MIN
0%
OFF
OFF
0%
ON
33k
Heat 2
N/A
MIN
0%
OFF
OFF
0%
ON
47k
Notes:
1
.
The supply fan % output is in reference to the user selected maximum unit fan speed. Unit will operate at 100% fan
speed during heating unless configured for MZVAV heating operation.
2
.
The supply fan and compressor outputs shall follow all startup and shutdown requirements prior to moving through
test mode steps that change the states of the compressor output from ON to OFF or OFF to ON.
3
.
All compressor % outputs are in reference to the 100% capacity point per unit tonnage.
(a)
During step 1 of the short-circuit based service test sequence; the IGV output is driven to 0%. However, for the 2.2kOhm resistance based service test
step approach - the IGV output is driven to 100%.
(b)
For multi-zone VAV units, the VFD command when "In-Control" will be controlled based on supply air pressure requirements for the unit.
(c)
VAV boxes are commanded to an open position during service test. However, six minutes must be allowed for the VAV boxes to reach a fully opened
position. During these 1st six minutes, duct static pressure control has control priority over the supply fan command of 100%.
Service Test Mode for units with two-speed indoor fan
control will control the indoor fan as is controlled
during normal unit operations during its corresponding
step in Service Test Mode. Refer to the table below for
additional information on unit operation during Service
Test.
Table 69.
Unit operation during service test
Test Step
Fan Speed Output
Fan On
Low
Econ
Low
Cool 1
Low
Cool 2
Low
Table 69.
Unit operation during service test
(continued)
Test Step
Fan Speed Output
Cool 3
High
Heat 1
High
Heat 2
High
Heat 3
High
Heat 4
High
Defrost or Dehumidification/ Reheat
High
Em. Heat
High
Summary of Contents for ReliaTel
Page 174: ...174 RT SVD03L EN N No ot te es s...
Page 175: ...RT SVD03L EN 175 N No ot te es s...