21
Fuji Driver
b)
Installation
1. Place holding screws and small brackets into the new unit and tighten screws. Ensure small brackets are
properly seated into the plastic housing before tightening.
2. Reconnect the
electrical connector
.
9.3. PLC
a)
Removal
•
Disconnect
the
power cord
from the machine.
1. Remove the
electrical side cover
.
2. Disconnect
electrical connectors
from the unit.
3. Unclip the
PLC
from the
din rail
and remove.
4. Remove
PLC
and if faulty replace with new unit.
b)
Installation
1. Clip the
PLC
onto the
din rail
and reconnect
electrical
connectors
.
(See Appendix: Electrical Schematic)
9.4. Power Supply
a)
Removal
•
Disconnect
the
power cord
from the machine.
1. Remove the
electrical side cover
.
2. Disconnect
electrical connectors
from the
power supply
.
3. Unclip the
power supply
from the
din rail
and remove.
4. Remove the
power supply
and if faulty replace with new unit.
b)
Installation
1. Clip the
power supply
onto the
din rail
and reconnect
electrical connectors
.
(See Appendix: Electrical
Schematic)
9.5. Motor Drive
a)
Removal
•
Disconnect
the
power cord
from the machine.
1. Remove the
electrical side cover
.
2. Disconnect
electrical connectors
from the
power supply
.
3. Unscrew the
motor drive
from the
side frame
.
4. Remove the
motor drive
and if faulty replace with new unit.
b)
Installation
1. Screw the
motor drive
to the chassis.
2. Reconnect the electrical connections. (See Appendix: Electrical
Schematic)
Figure 21: Power
Siemens Driver
Summary of Contents for 7K Plus
Page 2: ...ii...
Page 31: ...31 11 Appendix Side Frame Assembly Drawings...
Page 33: ...33 7KPlus Exploded Drive Train...
Page 34: ...34 10 Amp IEC Bracket Assy IEC Outlet...
Page 36: ...36 Retard Assembly...
Page 37: ...37 7KPlus Schematic...
Page 38: ...38...
Page 51: ...51...
Page 52: ...52 Phone 866 427 4546 Fax 603 332 8043 www brilininc com...